Layout, lean & capacity

Plant layout design and lean process optimisation

More output from the same floor, people and machines. We study how your plant actually runs, redesign layout and flow, balance lines and implement the changes with your team — not a report that sits on a shelf.

At a glance

Studies
Time & motion, line balancing, capacity, flow
Outputs
New layout, balanced stations, standard work
Methods
Lean, 5S, SMED, value-stream mapping
Timeline
Indicative 2–8 weeks study; phased implementation
Measured by
Output per shift, WIP, travel, floor space

Overview

Find the capacity you have already paid for

Before investing in a new line or a new building, most plants have capacity hidden in the current one: unbalanced stations, operators walking for parts, WIP piling up between operations, long changeovers, and layouts that grew one machine at a time.

We measure first — cycle times, walking distances, waiting, changeover and downtime — and map the value stream. Then we redesign layout and flow, rebalance work across stations, and set up standard work, part presentation and visual controls.

Where the study shows that new equipment is needed, we can design and build it. Where it does not, we help you implement the changes on the floor and measure the result against the baseline.

Before and after plant layout: spaghetti material flow versus straight one-piece flowBEFORE · SPAGHETTI FLOWAFTER · ONE-PIECE FLOWOP-10OP-20OP-30OP-40OP-50TRAVEL ↓ · WIP ↓ · FLOOR SPACE ↓
Spaghetti flow versus one-piece flow — schematic

What we build

Studies and improvements we deliver

Plant layout design

New layouts or re-layouts of shops and plants with material flow, aisles, storage and expansion planning.

Time & motion study

Stopwatch and video-based studies to set standard times and remove non-value-adding motion.

Line balancing

Redistributing work elements to hit takt time with fewer bottlenecks and less idle time.

Capacity assessment

Machine and line capacity against demand — where the real constraint is and what it costs you.

Value-stream mapping

Current- and future-state maps showing lead time, inventory and flow improvements.

5S & visual management

Workplace organisation, floor marking, shadow boards and visual controls that last.

SMED / changeover reduction

Moving internal setup to external, quick-change fixtures and standard changeover work.

Material presentation & kitting

Line-side racks, kitting trolleys and supermarkets that stop operators searching for parts.

Standard work & SOPs

Standard work sheets, SOPs and training aligned to the improved process.

Technical

Plant Layout & Process Optimisation — applications, specifications and deliverables

The same three-part technical structure on every solution page, so engineering and procurement can compare scopes without reading marketing copy.

Applications

What it is applied to

  • Plants running out of floor space
  • Lines that cannot reach rated output
  • High WIP and long internal lead times
  • Moving to a new building or adding a line
  • Preparing for a new customer's audit
  • Reducing overtime and dependence on specific operators

Not listed? Describe the operation — most scopes we quote are variations on these.

Typical specifications

What we engineer to

Study boundary
Single cell, line, shop or whole plant
Data captured
Cycle times, walking distance, WIP, changeover, downtime, space use
Takt basis
Target output per shift against available working time
Line balance target
Station loading balanced to within a stated percentage of takt
Layout options
Two or three costed options compared on flow, space and capital
Material presentation
Line-side racks, kitting, supermarket or direct feed
Expansion allowance
Future capacity held explicitly in the layout
Implementation
Study only, or study plus supervised implementation
Measurement
Before/after output, labour, WIP, lead time and floor space
Indicative timeline
2–8 weeks for the study, depending on data collection

Indicative ranges. Final specifications are fixed against your part and volume at design freeze.

Engineering deliverables

Documents you receive

  • Current-state layout and value-stream map
  • Time-study data, capacity model and bottleneck analysis
  • Proposed layout options in AutoCAD (DWG and PDF), compared and costed
  • Line balance and yamazumi chart with manpower plan
  • Material flow and presentation plan
  • Equipment and utility schedule for the proposed layout
  • Phased implementation plan sequenced around production
  • Standard work sheets and before/after measurement report

Programs and drawings are handed over, so your team is never dependent on us for a change.

Engineering scope

How each element is engineered

The design decisions behind the specification above.

Data capturedCycle times, walking distance, WIP, changeover time, downtime, space utilisation
ToolsTime study, video analysis, spaghetti diagrams, value-stream maps, simulation where useful
Layout deliverablesAutoCAD layouts (current and proposed), flow diagrams, phasing plan
ImplementationHands-on with your team — re-layout, fixtures, racks, standard work
Results measuredOutput per shift, labour productivity, WIP, lead time, floor space
EngagementFixed-scope study, or study plus implementation

Handover

What you receive

Every layout study project closes with a documented handover — not just a machine on the floor.

  • Current-state data and value-stream map
  • Bottleneck and capacity analysis
  • Layout options with pros and cons
  • Line balance and standard work sheets
  • Implementation plan phased around production
  • Before/after measurement report
  • Training for supervisors and operators

Execution

How we execute a layout and optimisation project

One project manager, stage gates you sign off, and no hand-offs between vendors.

Stage 01

Observe

Gemba walks, time studies and data collection across shifts.

→ Current-state baseline

Stage 02

Analyse

Bottleneck, waste, flow and capacity analysis.

→ Improvement options

Stage 03

Design

New layout, line balance, part presentation and standard work.

→ Approved future state

Stage 04

Implement

Re-layout, fixtures, racks and training — phased around production.

→ Changes live

Stage 05

Measure

Before/after measurement against the baseline.

→ Results report

Stage 06

Sustain

Audits, standard work and follow-up support.

→ Sustainment plan

Applications

Where it is used

  • Plants running out of floor space
  • Lines that cannot reach rated output
  • High WIP and long internal lead times
  • Moving to a new building or adding a line
  • Preparing for a new customer's audit
  • Reducing overtime and dependence on specific operators

Industries we serve

Why Mecwerx

Why manufacturers choose us for this

We measure before we redesign

Recommendations come from time studies and flow data on your floor, not from generic templates.

Implementation, not just a report

We stay to move equipment, build racks and fixtures, and train people.

Engineering depth

When the answer is new equipment, we can design and build it — one partner from study to solution.

Measured results

Every project closes with a before/after comparison against the baseline.

Quotation checklist

What we need for an accurate layout study quote

Send what you have. Missing details are fine — we will fill the gaps during the technical discussion.

  • Current layout drawing (even a rough sketch)
  • Products, volumes and shift pattern
  • Current output and target output
  • Main problems observed
  • Constraints — building, budget, timelines
  • Planned changes such as new products or expansion

FAQ

Plant Layout & Process Optimisation: common questions

What is included in a plant layout study?

Data collection on your floor, current-state layout and flow analysis, bottleneck identification, two or more layout options with material flow, a recommended layout and a phased implementation plan.

How long does a time and motion study take?

A focused study on one line typically needs one to two weeks of floor time plus analysis. Plant-wide studies take longer and are phased.

Can you improve output without buying new machines?

Often, yes. Line balancing, layout changes, part presentation, changeover reduction and standard work frequently recover significant capacity. The study shows how much before you commit capital.

Do you help implement the changes?

Yes. We plan and implement the changes with your team — equipment relocation, racks, fixtures, standard work and training — phased around production.

Can you design the layout for a new plant?

Yes. For new plants we develop the layout from your process and volumes and hand over the data your civil and MEP contractors need. Full execution is covered under turnkey plant setup.

Start a project

Hand over your production challenge.

Tell us what the line has to produce, where, and by when. We will come back with a scoped approach, a realistic timeline and the questions that matter — usually after a site visit or a drawing review.

Get a quick technical response

Share the basics — an engineer will call you back within one working day.

We use your details only to respond to this enquiry. NDA available on request. See our privacy policy.