Project scopes

The kind of projects we take on

Representative scopes across industries — how we structure scope, deliverables and timelines, from a single fixture set to a complete line.

These are illustrative scopes, not client case studies. Durations are indicative and depend on the final specification.

Representative scopeTier-1 supplier

Pneumatic weld fixtures for a two-wheeler frame programme

Fixture set for a new frame and swing-arm programme, sized for a fixed launch date.

Scope
Datum study, 3D design and build of pneumatic weld fixtures with part-presence sensing, plus checking fixtures
Deliverables
Fixtures, locator schedules, trial-part dimensional reports, re-certification checklists
Indicative
8–12 weeks from design freeze
Representative scopeComponent manufacturer

Axle sub-assembly line with torque traceability

Semi-automatic line converting a bench-based process into a balanced, error-proofed line.

Scope
Line balancing, pallet conveyor, press-fit SPM, DC nutrunners with torque-angle logging, end-of-line check
Deliverables
Line, PLC/HMI programs, error-proofing validation, SOPs and training
Indicative
4–6 months from design freeze
Representative scopeEV two-wheeler

Battery pack assembly line for a two-wheeler EV maker

Semi-automatic pack line moving from bench assembly to balanced flow with traceability.

Scope
Line balancing, ESD workstations, torque-monitored screwing, pack trolleys, EOL test station, data logging
Deliverables
Line, test station, traceability data hand-off, SOPs and training
Indicative
3–5 months from design freeze
Representative scopePack manufacturer

Enclosure leak test and EOL test benches

Test benches that stop sealing and functional defects before dispatch.

Scope
Sealing fixtures, pressure-decay leak testing, functional test integration, serial-wise data logging
Deliverables
Test benches, validation with master parts, calibration schedule
Indicative
10–14 weeks from design freeze
Representative scopeConstruction equipment

Boom and arm weld fixtures with positioners

Fixtures and positioning to control distortion and improve welder access on large weldments.

Scope
Datum study, heavy fixtures with hydraulic clamping, head-and-tailstock positioners, weld-sequence support
Deliverables
Fixtures, positioners, dimensional reports, operator instructions
Indicative
10–16 weeks from design freeze
Representative scopeTractor manufacturer

Converting bay assembly to a slat-conveyor line

Moving from bay assembly to a paced line with lifting aids and line-side supply.

Scope
Line study, slat conveyor, lifting aids, workstation and kitting design, andon
Deliverables
Line installed in phases, SOPs, training
Indicative
5–8 months, phased around production
Representative scopeAppliance manufacturer

Conveyorised assembly and test line for a localised product

A new line for a localised product with integrated testing and packing.

Scope
Line balancing, pallet/belt conveyor, ESD stations, safety and function test integration, packing conveyor
Deliverables
Line, test-data logging, SOPs, training
Indicative
4–6 months from design freeze
Representative scopeElectrical products

Switchgear assembly cell with torque and test traceability

U-cell assembly with error-proofing for an electrical products manufacturer.

Scope
U-cell layout, ergonomic workstations, torque-controlled screwing, test station, pick-to-light
Deliverables
Cell, error-proofing validation, standard work
Indicative
8–12 weeks from design freeze
Representative scopeManufacturing stores

Stores re-layout with racking and a kitting area

Re-layout of a manufacturer's stores to cut picking time and feed the line.

Scope
SKU analysis, layout, selective racking, flow racks, kitting area, trolley routes
Deliverables
Layout, installed racking with signage, kitting SOPs
Indicative
6–10 weeks after layout freeze
Representative scopeDistribution warehouse

Mezzanine and packing conveyor for a distribution centre

Adding storage and packing capacity inside an existing building.

Scope
Mezzanine design, shelving, packing stations, dispatch conveyor
Deliverables
Installed mezzanine and conveyor, load documentation, training
Indicative
8–12 weeks after design freeze

Every project

What every Mecwerx project includes

  • A named project manager and a stage-wise schedule
  • Design reviews and a formal design freeze
  • FAT with your parts before dispatch
  • Installation plan and site-readiness checklist
  • SAT against written acceptance criteria
  • Training, documentation and a support plan

Have a similar requirement?

Send a short description, drawings or photos. An engineer reviews it and responds within one working day.

Start a project

Hand over your production challenge.

Tell us what the line has to produce, where, and by when. We will come back with a scoped approach, a realistic timeline and the questions that matter — usually after a site visit or a drawing review.

Get a quick technical response

Share the basics — an engineer will call you back within one working day.

We use your details only to respond to this enquiry. NDA available on request. See our privacy policy.