How we work

One team, one execution flow — from study to stable output

Six stages, each closed by a gate you sign off. You always know what has been agreed, what comes next and who is accountable.

Six stages

The Mecwerx execution flow

STAGE 01

Study

Site visit, product and volume review, constraints, risks and a budget envelope.

You receive
Scope note, indicative budget and schedule
Gate
Go / no-go on concept and budget
STAGE 02

Engineer

Process design, line balance, layouts, 3D design, electrical and controls design, utilities data and design reviews.

You receive
Layouts, 3D models, specifications, utilities schedule
Gate
Design freeze — your sign-off
STAGE 03

Build

Manufacture, assembly, wiring and programming with stage inspections.

You receive
Progress reports and inspection records
Gate
Factory acceptance test (FAT) with your parts
STAGE 04

Install

Site-readiness check, dispatch, erection, alignment and utilities hook-up.

You receive
Installation plan and readiness checklist
Gate
Mechanical and electrical completion
STAGE 05

Commission

I/O and sequence checks, safety functions, trials, cycle-time and quality proving.

You receive
Commissioning protocol and results
Gate
Site acceptance test (SAT) against agreed criteria
STAGE 06

Stabilise & support

Ramp-up support, training, punch-list closure, handover and AMC options.

You receive
Handover dossier, training records, support plan
Gate
Handover sign-off

Governance

How projects stay on track

  • One project manager as your single point of contact
  • Weekly progress report with schedule and open points
  • Design reviews at concept stage and before freeze
  • Change requests documented with cost and time impact before execution
  • Stage inspections during build
  • FAT and SAT against written protocols
  • Punch lists tracked to closure with owners and dates
  • Escalation path to leadership at info@dryshades.com
Commissioning protocol checklist and production ramp-up curve reaching target outputFAT / SAT PROTOCOLTARGET OUTPUTRAMP-UP TO STABLE OUTPUTOEE
Protocol-based commissioning — schematic

Engagement models

Buy it the way that suits your project

Turnkey (lump sum)

Complete scope against a frozen specification — design, build, install, commission — with milestone payments.

Design & build

We engineer and build the equipment; you handle civil and utilities using our data.

Engineering study first

A paid study — layout, line balance, concept and budget — before you commit to the build.

Installation & commissioning

Site execution and ramp-up for equipment built by us or by others.

AMC & post-handover support

Preventive maintenance, breakdown support, spares and modifications.

Upgrade & retrofit

Capacity, automation, safety and traceability upgrades to existing lines and machines.

FAQ

Frequently asked questions

How are payments structured?

Typically as milestones linked to order, design freeze, FAT, delivery and SAT. The exact split is agreed per project and written into the contract.

What happens if the scope changes mid-project?

Changes are raised as change requests with their cost and schedule impact documented and approved before any work on them starts.

Who is our point of contact?

One project manager from study to handover, with a clear escalation path to leadership.

Is the equipment covered by warranty?

Yes. Warranty terms are defined in each contract, with post-handover support and AMC options beyond the warranty period.

Start a project

Hand over your production challenge.

Tell us what the line has to produce, where, and by when. We will come back with a scoped approach, a realistic timeline and the questions that matter — usually after a site visit or a drawing review.

Get a quick technical response

Share the basics — an engineer will call you back within one working day.

We use your details only to respond to this enquiry. NDA available on request. See our privacy policy.