Installation, commissioning & support

Machine installation, commissioning and plant shifting

The riskiest weeks of any project fall between delivery and stable production. We plan and execute installation, commissioning, relocation and ramp-up so equipment reaches rated output quickly — with documented acceptance at every step.

At a glance

Scope
Erection, alignment, hook-up, commissioning, ramp-up
Equipment
Lines, SPMs, conveyors, presses, machines
Relocation
Dismantling, shifting, re-installation, re-validation
Acceptance
FAT, SAT, punch-list closure
After handover
AMC, spares, modifications, training

Overview

From delivery to stable output — without the gap

Equipment that works at the builder's facility often struggles on site: foundations are not ready, utilities are undersized, interfaces between vendors do not match, and nobody owns the ramp-up. Weeks are lost and the start-of-production date slips.

We plan installation before equipment is dispatched — foundation and anchoring data, utilities readiness checks, rigging plans, interface lists and a commissioning protocol with acceptance criteria. On site, our team erects, aligns, connects and commissions, then supports the plant through ramp-up until output is stable.

We also relocate existing plants and lines — dismantling, tagging, shifting, re-installation and re-validation — and can act as the single site lead for equipment supplied by others.

Commissioning protocol checklist and production ramp-up curve reaching target outputFAT / SAT PROTOCOLTARGET OUTPUTRAMP-UP TO STABLE OUTPUTOEE
Commissioning protocol and ramp-up to target output — schematic

What we build

Installation and commissioning services

Machine & line installation

Erection, levelling, alignment, anchoring and utilities hook-up for machines, lines and conveyors.

Commissioning & trials

Dry runs, I/O checks, safety-function tests, trial production and cycle-time proving.

FAT & SAT management

Protocols, witness tests and signed acceptance at the builder's facility and on your site.

Plant shifting & relocation

Dismantling, tagging, packing, transport coordination, re-installation and re-commissioning.

Single site lead for multiple suppliers

One accountable lead for interfaces, schedule and acceptance when several suppliers are involved.

Ramp-up & stabilisation

On-site engineers during ramp-up to fix issues, train operators and tune the process.

Preventive maintenance & AMC

Planned maintenance, inspections and breakdown support after handover.

Modifications & upgrades

Variant additions, safety upgrades, control retrofits and capacity upgrades to installed equipment.

Documentation & training

SOPs, maintenance manuals, spares lists and structured operator and maintenance training.

Technical

Installation & Commissioning — applications, specifications and deliverables

The same three-part technical structure on every solution page, so engineering and procurement can compare scopes without reading marketing copy.

Applications

What it is applied to

  • New line installation in a running plant
  • Commissioning imported machines
  • Relocating a plant to a new building or city
  • Consolidating two plants into one
  • Ramp-up support for a new model launch
  • Annual maintenance of lines, conveyors and SPMs

Not listed? Describe the operation — most scopes we quote are variations on these.

Typical specifications

What we engineer to

Scope
Single machine to complete line or plant relocation
Site survey
Floor level and load, headroom, access route, utility capacity
Foundation / anchoring
Chemical or mechanical anchors, grouting, levelling to spec
Alignment tolerance
Set against the equipment maker's tolerance and verified
Utility hook-up
Power, earthing, compressed air, water, exhaust
Commissioning sequence
Loop check, I/O verification, safety validation, dry cycle, first part
Acceptance
Written SAT protocol agreed during engineering, signed on site
Window
Shutdown, weekend or phased installation planned backwards from restart
Ramp-up support
Supported production over agreed shifts with downtime tracking
Coverage
Delhi NCR base, site teams mobilised pan-India

Indicative ranges. Final specifications are fixed against your part and volume at design freeze.

Engineering deliverables

Documents you receive

  • Site survey report with as-found dimensions and utility capacity
  • Rigging and installation method statement with sequence
  • As-installed layout drawing marked up on site
  • Loop check and I/O verification records
  • Safety circuit validation record
  • Commissioning checklist with first-off part results
  • Signed SAT report and punch list with closure dates
  • Ramp-up log and operator/maintenance training records

Programs and drawings are handed over, so your team is never dependent on us for a change.

Engineering scope

How each element is engineered

The design decisions behind the specification above.

Pre-installationFoundation and anchoring data, utilities readiness checklist, rigging plan, site safety plan
InstallationLevelling and alignment to specified tolerances, grouting support, utilities connection
ElectricalCable-laying coordination, panel installation, I/O and earthing checks
CommissioningProtocol-based: I/O, sequences, safety functions, trial runs, cycle time
AcceptanceSAT against agreed criteria; punch list tracked to closure
RelocationTagging, match-marking, photographic records, re-validation after re-installation
After handoverAMC, on-call support, spares and modification services

Handover

What you receive

Every installation project closes with a documented handover — not just a machine on the floor.

  • Installation plan and site-readiness checklist
  • Commissioning protocol with acceptance criteria
  • Signed SAT and punch-list closure record
  • Updated as-built drawings and program backups
  • Operator and maintenance training records
  • Preventive maintenance schedule
  • Support and escalation plan

Execution

How we execute installation and commissioning

One project manager, stage gates you sign off, and no hand-offs between vendors.

Stage 01

Plan

Site survey, readiness checks, rigging and installation plan.

→ Installation plan

Stage 02

Prepare

Foundations, utilities and interfaces verified before dispatch.

→ Site ready

Stage 03

Install

Erection, alignment, anchoring and hook-up.

→ Mechanical completion

Stage 04

Commission

I/O, sequences, safety functions and trial production.

→ SAT

Stage 05

Ramp up

On-site support until output stabilises.

→ Stable output

Stage 06

Support

AMC, spares, modifications and training.

→ Support plan

Applications

Where it is used

  • New line installation in a running plant
  • Commissioning imported machines
  • Relocating a plant to a new building or city
  • Consolidating two plants into one
  • Ramp-up support for a new model launch
  • Annual maintenance of lines, conveyors and SPMs

Industries we serve

Why Mecwerx

Why manufacturers choose us for this

Planned before dispatch

Site readiness, utilities and interfaces are verified before equipment arrives.

Protocol-based acceptance

Every system is accepted against written criteria — not a verbal 'it works'.

One site lead

Even with multiple suppliers, you get one accountable person on site.

We stay for ramp-up

Support continues until output is stable, not until the machine is switched on.

Quotation checklist

What we need for an accurate installation quote

Send what you have. Missing details are fine — we will fill the gaps during the technical discussion.

  • Equipment list with sizes and weights
  • Current and new site layouts
  • Target dates and production windows
  • Utilities available at site
  • Equipment suppliers involved
  • Scope: installation only, or with commissioning and ramp-up

FAQ

Installation & Commissioning: common questions

What is the difference between FAT and SAT?

A factory acceptance test (FAT) is done at the builder's facility before dispatch to prove the equipment meets specification. A site acceptance test (SAT) is done after installation at your plant to prove it performs in your conditions, with your utilities and parts.

Can you install and commission equipment supplied by other vendors?

Yes. We can act as the single site lead — coordinating installation, interfaces and commissioning of equipment from multiple suppliers — or install and commission specific machines to their documentation.

Do you shift complete plants?

Yes. We plan and execute plant and line relocation: dismantling with tagging and records, shifting coordination, re-installation, re-commissioning and re-validation, phased to limit lost production.

Do you offer AMC for lines and machines?

Yes. Annual maintenance contracts cover planned preventive maintenance, inspections and breakdown support for lines, conveyors, SPMs and fixtures.

How do you minimise downtime when installing in a running plant?

Equipment is pre-built and tested before it arrives, site work is sequenced into shutdowns, weekends or phased cut-overs, and utilities and interfaces are made ready in advance.

Start a project

Hand over your production challenge.

Tell us what the line has to produce, where, and by when. We will come back with a scoped approach, a realistic timeline and the questions that matter — usually after a site visit or a drawing review.

Get a quick technical response

Share the basics — an engineer will call you back within one working day.

We use your details only to respond to this enquiry. NDA available on request. See our privacy policy.