Turnkey plant engineering · Greater Noida (NCR) · Pan-India execution +91 85959 55435info@mecwerx.comWhatsApp

Preliminary engineering assessment

Get an engineering assessment

Four steps, about three minutes. Tell us what you are trying to build, attach whatever you have, and give us the production numbers. An engineer reviews it and comes back within one working day with questions, an approach and an indicative budget — not a brochure.

  1. 1What you are building
  2. 2What you can share
  3. 3Production data
  4. 4Contact
Step 1 · What are you trying to build?
Step 2 · What can you share?

Anything you have moves the assessment forward. Nothing at all is fine too — say so and we work from a call or a site visit.

  • DrawingsPart, assembly or GA — PDF, DWG, DXF, STEP, IGES
  • BOQ / BOMExcel or PDF bill of quantities or materials
  • LayoutExisting or proposed floor plan, any format
  • PhotosThe station, the part, the current problem
  • VideoThe operation running — often the most useful single file

Up to 5 files, 25 MB each. Larger files or a full drawing pack — send them on WhatsApp or ask us for an upload link.

Step 3 · Production information

These six numbers decide the concept, the station count and most of the cost. Estimates are fine — write “not known” where you are not sure.

Step 4 · Who should we come back to?

We use your details only to respond to this enquiry. NDA available on request. See our privacy policy.