Turnkey plant engineering · Greater Noida (NCR) · Pan-India execution +91 85959 55435info@mecwerx.comWhatsApp

Service area · Gurugram–Manesar, Haryana

Assembly lines, fixtures and automation for Gurugram and Manesar

The Gurugram–Manesar belt is the heart of North India's automotive industry. We support OEM plants and Tier-1 and Tier-2 suppliers with fixtures, lines, SPMs, robotic cells and test equipment built for automotive quality systems.

Service area

Industrial areas
IMT Manesar (Sectors 1–8), Udyog Vihar Phase I–VI, Sohna industrial belt, Pataudi Road and Binola…
Typical sectors
Passenger cars, two-wheelers, auto components, electronics
Base
Greater Noida (NCR), Uttar Pradesh
Site visits
Usually within 1–2 working days

Local execution

Automotive quality, delivered to programme dates

Gurugram and IMT Manesar host a dense cluster of passenger-car and two-wheeler OEM operations and hundreds of Tier-1 and Tier-2 suppliers. Programmes launch on fixed dates, quality expectations are strict, and equipment must support PPAP, traceability and run-at-rate from day one.

We design and build the equipment suppliers here need most — weld fixtures and robotic cells, sub-assembly lines with torque monitoring, SPMs and leak test benches — and commission it with the evidence your customer asks for.

For suppliers expanding towards Bawal, Dharuhera and Kharkhoda, we handle new lines and relocations across the belt.

Industrial areas we cover

  • IMT Manesar (Sectors 1–8)
  • Udyog Vihar Phase I–VI
  • Sohna industrial belt
  • Pataudi Road and Binola
  • Sector 37 and Khandsa
  • Dharuhera road corridor

Common requirements

What manufacturers in Gurugram & Manesar ask us for

Fixtures for new programmes

Weld and checking fixtures designed and proven in time for PPAP.

Robotic welding cells

Robotic MIG and spot welding cells with fixtures and turntables.

Traceability upgrades

Adding torque, leak and press data logging to existing lines.

Line relocation within the belt

Shifting lines to new plants in Bawal, Dharuhera or Kharkhoda with minimum supply disruption.

FAQ

Working with Mecwerx in Gurugram & Manesar

Do you work with Tier-1 suppliers in IMT Manesar?

Yes. Fixtures, sub-assembly lines, SPMs, robotic cells and test benches for Tier-1 and Tier-2 automotive suppliers are a core part of our work.

Can you support PPAP timelines for a new programme?

Yes. Schedules are planned backwards from your SOP, and FAT/SAT trials generate the capability and traceability data your customer expects.

Do you relocate lines within the Gurugram–Bawal belt?

Yes. We plan and execute relocations with tagging, re-installation and re-validation, phased to protect supply.

Start a project

Planning a line, machine or plant in Gurugram & Manesar?

Tell us what the line has to produce, where, and by when. We will come back with a scoped approach, a realistic timeline and the questions that matter — usually after a site visit or a drawing review.

Get a quick technical response

Share the basics — an engineer will call you back within one working day.

We use your details only to respond to this enquiry. NDA available on request. See our privacy policy.