Discipline 04
Project execution — survey, install, commission, prove, ramp up
Equipment delivered is not output achieved. This discipline covers everything between a machine leaving the build floor and your line holding its target rate with your operators running it.
At a glance
- Covers
- Site survey, installation, commissioning, FAT, SAT, ramp-up, training
- Acceptance
- Written FAT before dispatch, SAT on your site
- Windows
- Shutdown, weekend and phased installation
- Coverage
- Greater Noida (NCR) base · Pan-India site execution
- Closeout
- Punch list closed, dossier handed over, training recorded
What it covers
Survey, installation, commissioning, FAT, SAT, ramp-up, training
Most disputes on capital projects happen in this stage, and almost all of them come from the same cause: acceptance was never written down. What rate, on which parts, measured how, over what period.
We fix that at the start. FAT and SAT protocols are agreed during engineering, not negotiated at handover, so the argument about whether the machine performs becomes a measurement rather than an opinion.
Capabilities
The seven capabilities inside project execution
Each one is a scope you can buy on its own, or combine into a turnkey contract.
Site Survey
Floor levels and load capacity, available headroom and access route for rigging, power, air and water points with actual available capacity, existing equipment interfaces, and the constraints nobody mentioned until the truck arrived.
You receiveSurvey report, as-found dimensions, utility schedule, access plan
Installation
Unloading and rigging, foundation and anchoring, levelling and alignment, conveyor and station interfacing, utilities hook-up, and cable and pipe routing that suits your plant rather than the shortest path.
You receiveInstalled and aligned equipment, as-installed marked-up layout
Commissioning
Power-up and loop checks, I/O verification, direction and interlock checks, safety circuit validation, dry cycles, then first parts. Faults found here are corrected here — not logged for later.
You receiveCommissioning checklist, safety validation, first-off parts
FAT
A written protocol agreed during engineering: your parts, target cycle time, repeatability on the critical characteristic, safety function checks and alarm behaviour. Run on our floor, witnessed by you, signed before dispatch.
You receiveFAT protocol and signed report with measured results
SAT
Repeat of the agreed protocol after installation, in your environment with your utilities, operators and material supply. Anything that behaves differently on site is found here, against a written standard.
You receiveSAT protocol and signed report, punch list with closure dates
Ramp-up
Supported production over the first shifts, cycle-time and downtime tracking, adjustment of set points and buffers, quick fixes to the things only volume reveals, and handover of the stabilised parameters.
You receiveRamp-up log, stabilised parameters, output against target
Training
Operator training on running, changeover and fault recovery; maintenance training on the PLC, drives, pneumatics, safety and wear parts; documented and attended, so competence survives an operator leaving.
You receiveTraining sessions, SOPs, maintenance schedule, attendance record
Deliverables
What you receive
- Site survey report with as-found dimensions and utility capacity
- Agreed FAT and SAT protocols written during engineering
- Signed FAT report before dispatch, with measured results
- Installed, aligned and hooked-up equipment with as-installed layout
- Commissioning checklist and safety validation record
- Signed SAT report and a punch list with closure dates
- Ramp-up log showing output against the agreed target
- Operator and maintenance training with SOPs and records
Other disciplines
The rest of the scope
Any one discipline can be bought alone. Combined, they become a single contract with one party accountable for the output.
Where it applies
Solutions that use project execution
Installation & Commissioning
Installation, commissioning, plant shifting and ramp-up support — accepted against written criteria.
Learn moreTurnkey Plant Setup
Greenfield and brownfield plants — layout, utilities, equipment, lines and commissioning under one contract.
Learn moreAssembly Lines
Takt-balanced manual, semi-automatic and automated lines with conveyors, error-proofing and traceability.
Learn moreTest Benches & Leak Testing
Leak testers, end-of-line function testers and inspection stations with fixturing and serial-wise data.
Learn moreFAQ
Project Execution: common questions
Can you install during a shutdown window?
Yes. Shutdown, weekend and phased installations are planned backwards from your restart time, with the pre-work, rigging sequence and contingency agreed before the window opens.
What happens if the machine misses the agreed cycle time?
It does not get signed off. FAT and SAT are measured against a protocol agreed during engineering, and the machine is corrected until it meets it. That is what single-point responsibility is for.
Do you work on sites outside Delhi NCR?
Yes. Engineering and build are managed from Greater Noida (NCR) and site teams mobilise across India for installation, commissioning and ramp-up.
Do you relocate existing plant and machinery?
Yes. Plant relocation — de-installation, marking, transport coordination, re-installation, alignment and re-commissioning — is a regular scope, usually against a fixed shutdown window.
Start a project
Hand over your production challenge.
Tell us what the line has to produce, where, and by when. We will come back with a scoped approach, a realistic timeline and the questions that matter — usually after a site visit or a drawing review.